Bendpak 2 Post Lift Concrete Requirements
Hey there, gearhead! Ever wondered what's under the hood when it comes to setting up a BendPak 2 Post Lift? Buckle up, 'cause we're about to dive into the concrete jungle - literally!
Concrete: The Unsung Hero
Before you start dreaming about that shiny new lift, let's talk about the unsung hero of this story - concrete. Yep, you heard it right. Concrete might not be as sexy as a sleek car or a powerful lift, but it's the backbone of your garage dreams.
Strength in Numbers
Now, you might be thinking, "How much concrete do I need for this bad boy?" Well, it depends on the model. For a BendPak 2 Post Lift, you're looking at around 4 cubic yards of concrete. That's enough to fill a small swimming pool, or, you know, make a really big cake. (Don't try to eat it, though. Trust me.)
Must Read
But why so much? Well, these lifts are no lightweight. They can handle up to 10,000 pounds, which is like lifting a small elephant. So, you need a solid foundation to keep everything steady and safe.
Size Matters
Next up, let's talk size. You'll need a concrete pad that's at least 10 feet by 10 feet and at least 6 inches thick. That's about the size of a small bedroom, or a really cozy dance floor. Just imagine, you could be dancing on top of your future garage masterpiece!
Level Up
Now, here's where things get a little tricky. You want your concrete pad to be as level as possible. Why? Because nobody wants a wonky lift, right? So, you'll need to make sure your pad is within a 1/8 inch tolerance across the entire surface. That's like trying to keep your car perfectly straight on a long road trip. Not easy, but totally doable.
Let's Get Technical
Alright, let's geek out a little. You'll want to use a concrete mix that's at least a 4000 psi strength. That's some serious muscle. And don't forget to reinforce it with some steel rebar. It's like giving your concrete a six-pack. (Again, don't try to eat it.)

And here's a fun fact for you: The concrete used for the Hoover Dam is around 5000 psi. So, your garage floor is basically a mini Hoover Dam. How cool is that?
Weather: The Party Crasher
Now, let's talk about the party crasher - weather. You'll want to pour your concrete when the temperature is between 50°F and 90°F. Any colder or hotter, and your concrete might not set properly. It's like Goldilocks - not too hot, not too cold, just right.
Patience, Young Grasshopper
Finally, here's the part that'll test your patience: you'll need to wait at least 7 days before you can use your lift. That's like waiting for Christmas as a kid. But trust me, it'll be worth it when you finally get to park your ride on that bad boy.
So there you have it, folks! The not-so-secret life of a BendPak 2 Post Lift. Who knew concrete could be so exciting, right? Now go forth and build that dream garage!
